The ground loop is the most expensive and least forgiving part of a geothermal heat pump system. It's buried, it has to perform for decades, and mistakes are hard to fix. Carda Geothermal Engineering designs closed-loop ground heat exchangers that are sized to the real loads, properly piped, buildable and serviceable, and coordinated with the mechanical system they serve.

What's included in ground loop design

  • Concept sizing and feasibility. Early borefield size, land area and budget range to test whether geothermal fits the site.
  • Thermal conductivity testing. Recommending when a TC test is worth it, specifying the test, and interpreting results. Without one, the design uses conservative published values for the local geology, and says so.
  • Borefield sizing. Bore count, depth and spacing based on peak and annual loads, with long-term ground temperature analysis and design entering and leaving fluid temperatures.
  • Hybrid system sizing. Supplemental boiler or cooling tower capacity where it lowers first cost or balances the ground, when the loads call for it.
  • Loop layout. Circuiting, step-down and step-up reverse-return headers, vaults, manifolds and building entry.
  • Pipe sizing calculations. Circuit and header pipe sizing and head loss, flow balance, flushing and purge flow requirements, and pump duty at the loop interface.
  • Heat-transfer fluid. Antifreeze selection and concentration, freeze protection, and material compatibility.
  • Installation details and specifications. Drawings and written specs covering pipe, fusion, grout, pressure testing, flushing and purging, ready for bidding and construction.

Who it's for

  • Mechanical engineers of record who want a ground loop specialist on the team
  • Design-build contractors and drilling contractors who need a buildable design and drawings
  • Owners and developers comparing geothermal options early in a project

Deliverables

  • Ground loop design summary report
  • Site layout schematic
  • Installation detail drawings (PDF and AutoCAD)
  • Pipe sizing and head loss calculations
  • Ground loop technical specifications

Loop types

Vertical closed-loop borefields are the core of the practice. Horizontal loops and hybrid systems are also designed when the site and loads support them.

Frequently asked questions

What information do you need to design a ground loop?

Peak block heating and cooling loads, annual energy use, the heat pump schedule, a site plan, and the piping, pump and fluid design. Geology data or a thermal conductivity test result helps but isn't required to start.

Do I need a thermal conductivity test?

For larger systems it often pays for itself by tightening the design. For smaller projects, conservative published values may be enough. We'll recommend one way or the other based on project size and risk.

Can you design the loop if someone else is designing the building HVAC?

Yes. That's the most common arrangement. We coordinate with the engineer of record so the loop and the interior system agree on temperatures, flows and fluid.